Top - Thyssenkrupp Levant Stair Lift Installation Manual

Try to operate the lift while the seat is rotated. The unit must not move unless the seat is locked in the riding position.

Whether you are a professional technician or evaluating the complexity of the installation process, this overview covers everything needed for a successful top-to-bottom setup. Pre-Installation Requirements and Tools

Thyssenkrupp Levant Stair Lift Installation Manual Top Guidelines

: The sections are connected, often involving the routing of internal wiring that facilitates the "call and send" system. Charging Points thyssenkrupp levant stair lift installation manual top

Are you encountering any specific during testing?

Place the rail on the stairs. Use spacers to maintain a consistent distance from the wall (usually 5 to 7 inches).

Carefully unbox the three primary packages: the rail sections, the drive chassis (carriage), and the seat assembly. Organize all hardware by size and type before proceeding. Try to operate the lift while the seat is rotated

: Bolt the seat tower onto the carriage. Check that the manual or automatic swivel mechanism locks securely into place at the top landing for safe transfers. 5. Wiring and Charging Stations

You will need a standard electrical outlet near the top or bottom of the staircase to power the battery charging system. Do not use extension cords.

The ThyssenKrupp Levant operates on a 24V DC battery system, which continuously recharges when the unit parks at designated stations at the top or bottom of the rail. Use spacers to maintain a consistent distance from

With the rail structurally assembled but floating, you can introduce the drive elements. Step 1: Mounting the Drive Chassis

is a highly reliable solution engineered for comfort, ease of use, and straightforward setup.

Before unboxing the components, you must assess the installation site and gather the necessary equipment. Accurate preparation prevents structural damage and reduces installation time. Site Assessment and Clearance Checks

Typical installation for a straight staircase takes a few hours once the rail has been custom‑measured and pre‑cut.

Scroll to Top